Purge Process for Gas Engineers
1. Isolate and lock off the gas main - Safety critical
Prevent any accidental re energising of the gas supply before you start.
- Turn off at the ECV or designated isolation valve
- Fit lock off device and tag (LOTO) unless purge is actively underway
- Confirm all relevant persons know the supply is isolated
2. Verify isolation and system condition - Pre checks
Make sure the section to be purged is safe and gas‑tight.
- Perform a tightness test on the section to be purged
- Confirm zero pressure downstream of the isolation point
- Check ventilation is adequate and the area is safe to work
3. Set up safe purge discharge - Vent safely
Arrange a controlled route for gas or air to leave the system.
- Connect to a purge stack or safe discharge point to open air
- Connect to a purge stack or safe discharge point to open air
- Position personnel away from the discharge point and maintain communication
4. Select method by installation size
Method choice
Use the correct standard and technique for the pipework volume.
- For small/domestic (<35 mm, UP/1A): use direct purging via purge stack
- For larger systems (>35 mm, UP/1): consider displacement purging with nitrogen if required
- Confirm you have the correct equipment for the chosen method
5. Carry out the purge
Controlled operation
Remove gas or air in a controlled, monitored way.
- Use a gas analyser at the discharge point to monitor concentration
- Maintain ventilation and continuous supervision throughout
- Continue purging until gas concentration is below 1% before opening to atmosphere or working on pipework
6. Secure system and lock off if paused
If job not complete
Ensure the installation cannot be left in a dangerous state.
- If work is paused, left unattended, or incomplete, lock off the main again
- Tag the isolation point with status and contact details
- Only remove lock off when recommissioning under control
7. Recommission or leave safely - Final step
Finish the job or leave the system in a safe, documented condition.
- If recommissioning, follow full tightness test and lighting procedures
- Record purge details, test results, and any permits used
- Confirm all appliances and pipework are safe before handing back to the user